The article outlines the steps to Edit Duration of a Task on a Job. 

 

FOLLOW STEPS BELOW:

 

1. Locate and open the specific Job for which you wish to edit duration for a task.

2. Access the window displaying the critical path steps associated with the selected Job. 

3. Double-click the specific step for which you intend to edit duration.

4. Change duration to desired value.

    Optional: Update and Units/Day value and press the icon to calculate duration.

5. Select "✔ OK".

 

NB. For a quick tutorial watch below