The article outlines the steps to Add a Variance to a Task on a Job. 

 

FOLLOW STEPS BELOW:

 

1. Locate and open the specific Job for which you wish to add variance to a task.

2. Access the window displaying the critical path steps associated with the selected Job. 

3. Double-click the specific step you intend to add variance.

4. Change variance to desired value.

5. Add relevant comment .

6. Select " OK".

 

NB. For a quick tutorial watch below